The product effectively shows environmental safety and energy preserving. EPG was awarded with “well-known product of Zhejiang Province” and “well-known brand of Zhejiang Province”. we have obtained the have confidence in of purchasers around the world.
XSR Circulation EPT for EPT Network
Item Introduction:
XSR sequence one phase double suction spEPTT case pump are EPTTly designed for transferring circulation drinking water in heat community of thermal EPTT EPTT. The pump for municipal warmth community will EPT the h2o flow like a circle in the community. Circulation water which circulation back from the municipal heat network will be boosted by the pump and heated by the heater, and then transferred return to the municipal warmth network.
Primary efficiency parameters
Diameter of pump outlet: DN200 to DN900
EPT Capacity: Q: 500-5000 m3/h
EPT raise head range: H:60-220m
EPT operating temperature: T -200deg C
EPT operating voltage: 380V to 10000V, 50Hz amp 60Hz
EPT Supporting Software and Solutions
We price the power conserving and environmental defense,by examining the demands of media and procedure atmosphere,undertake optional mixtures of supplies at the areas speak to with media,insure protection,reliability,affordable procedure.
EPTT Drawings
Structural Attributes:
one: Kind XSR pumps perform stably with significantly less sound and vibration, owing to brief spacing between each aspect supports.
two: The identical rotor of variety XSR pumps can be operated in reverse path to stay away from harm to the pumps by h2o hammer.
three):Special layout of large temperature sort: outer cooling drinking water will be available given that the bearing with cooling chamber the bearing could be lubricated by oil or grease,If the website has the same external ambient desalted h2o as the pumps transport medium ,and the stress is 1-2 kg/cm2 larger than the pump inlet stress, although mechanical seal washing water can be connected with above circumstances are not accessible, please follow the following instruction: cooling and filtering the large temperature dXiHu (West EPT) Dis.Hu (West EPT) Dis.eralized water which from the pump outlet to flush the mechanical seals, which could make the mechanical seals much more steady and endurable a h2o indicator need to be fixed on the flush water technique, which could monitor the flush h2o and adjust the h2o stream and force(generally the stress must be one-2kg/cm2 higher than the pump inlet stress) Bimetal thermometer should be coupled guiding the heater exchanger, and the alarming device optional, which could react whilst the temperature exceed limit Also a differential force switch was optional, which would checking the heater exchanger. Above EPT design tends to make the pump could function in substantial temperature problems close to two hundred centigrade
four:Velocity detection device coupled with speed measuring instrument and the probe will be configured at the shaft extension situation if the pump was EPTn by variable frequency motor or steam turbine othe1wise it will be configured at the coupling device if the pump was EPTn by typical motor with EPT coupling.
five: Variety XSR pumps can be vertically or horizontally mounted in accordance to distinct doing work condition, with EPT temperature EPTT seal or EPT seals can also use cartridge seals, so it is extremely simple and basic to replace them.
6:With EPTT design and style, the outline of XSR is obvious and stunning in line with modern day aesthetics .
seven:The effectiveness of XSR pumps are 2%-3% increased than the exact same type pumps because of to adopting EPTd EPT model and as a result lessen the operating EPTs significantly.
eight:Deciding on EPTT model bearing, and other elements substance picked by customer, make the pump suitable
for any operation issue and decrease the upkeep EPTings.
9: It is quick and straightforward to assemble and dismount the rotor areas due to utilizing elastic prestress assembling.
ten:It is unnecessary to make adjustment to any clearance when assembling .
Efficiency Information
Type | Capability (m sup3/h) | EPT (m) | Pace (r/min) | shaft EPTT (kw) | EPT EPTT (kw) | EFF(%) | NPSH(m) |
XSR product | 72-2000 | seven-186 | 2900/1450/985/485 | 7.4-1403 | eleven-1600 | sixty eight-92 | one.7-11 |
Precautions
1. Inspection before commencing
Be sure to check the followings:
(1) Insure pump plate fastened on foundation
(2) Insure coupling and pump device alignment
(3) Insure piping related by requirements
(four) Insure motor mounted by Installation and operation instruction
(5) Insure the rotor of pump rotate easily (at lEPT a circle)
(6) Insure the coupling guard set up
(7) Insure the operator totally understand the security specification that they need to obey and the failures might be occurred
(8) Insure the shaft seal liquid or cooling liquid guide-in by requirements
(nine) Insure the shaft seal mounted by operation instruction
(ten) Insure the auXiHu (West EPT) Dis.liary device put in by operation instruction (If they eXiHu (West EPT) Dis.st)
(11) nsure the bearing have lubricated properly, eEPTTly insure new pump grease or thin oil do not decrease or go negative
(twelve) Insure the air trapped in pump escaped.
2. Shaft Seal
Open valves appropriately for stuffing box seal
3. Air exhaust
EPT and piping should fill of medium before beginning, there are two methods: development of EPT or priming. If the pump operated on the suction point out, eXiHu (West EPT) Dis.t fuel by bolt gap on top of the pump casing.
Be aware: When development of EPT, evacuate air by bolt gap on leading of the pump casing. When priming, open up both aspect minimal stress volute chamber of pump casing and the best plug, to get rid of pump vibration by remained air in pump.
4. Beginning
(1) Shut outlet valve
(two) Open inlet valve totally
(three) Open all auXiHu (West EPT) Dis.liary piping (cooling, heating, sealing, rinsing and lubricant liquid), and check all capacity and stress
(4) Starting up pump after ending above processes
(5) When the method beginning provide medium and the strain reading at strain gauge increase up, open up outlet valve little by little.
Be aware: Forbid pump functioning with out liquid! Only near outlet valve when the pump begin and shutdown, otherwise will harm the pump by overheating.
5. Operation
(1)
Validate operating position
In accordance to Q-H functionality curve of pump, potential Q differs with the genuine operation head. The head depended on the technique head (incXiHu (West EPT) Dis.Hu (West EPT) Dis. the altitude distinction amongst inlet and outlet, piping, valves, radiator and so on). So the pump in fact functioning position B is dependent on pump functionality
curve Q-H and system performance curve Q-EPT.
When ability settled, the shaft EPTT, efficiency, NPSH settled as effectively. EPT has minimal operating selection. The minimal potential are proven as Qmin in Q-H performance curve. MaXiHu (West EPT) Dis.mum potential are depended on the cross level of pump tolerance NPSH and technique legitimate NPSEPT. Modify valve can modify functionality curve Q-EPT of method, thus alter procedure performance, can make pump operation secure and substantial efficiency.
(two) Procedure management
JCEP shell out focus to followings:
a. EPT must perform stably
b. Forbid pump functioning with out liquid
c. To prevent medium temperature increase up, pump can not be operate EPTT period when shut outlet valve
d. EPTTly, the bearing temperature not larger than 35 ordmC of ambient temperature, absolute
operation temperature much less than one hundred ordmC.
e. Check oil level regularly if use skinny oil. Deep groove ball bearing of grease lubrication no need regimen upkeep.
f. Do not shut inlet valve (if it is eXiHu (West EPT) Dis.st) when pump functioning.
g. Periodical inspection and start off jury pump.
h. Verify auXiHu (West EPT) Dis.liary piping whether or not connected well.
i. Check elastic aspect of coupling, if worn substitute instantly.
j. For stuffing box seal there must have a sligEPTT drip when working, thrust stuffing box gland carefully until finally there is a sligEPTT drip (about 15-thirty drop/min ).
For mechanical seal the seal leakage should decrease slowly. It is about -5drop/min following
beginning couple of hours. If the seal leakage boost slowly and get to about 30-60drop/min, need to check or change mechanical seal.
6. Shutdown
Shut discharge valve.
Insure the pump device quit easily when shutdown the motor. EPT need to have a appropriate following-managing period of time, reduce warmth source at this time, so that the delivered medium can amazing down entirely and steer clear of of making any heat within pump.
Shut suction valve if pump end perform for a EPTT period of time.
Shut auXiHu (West EPT) Dis.liary piping, the shaft seal must use seal lubricant even even though at stopped point out. Evacuate all medium in pump and piping when freeze or quit perform for a EPTT-time period, so as not to frost crack.
seven. Storage
Every pump has inspected strictly ahead of delivery. EPTmmend to undertake subsequent techniques to retailer pump.
(one) Shop new pump
If keep pump at indoor, thoroughly clean dry place and comply with the storage requirements, the EPTTest storage time is twelve months.
(two) If equipment is to be stored for EPTT durations of time need to stick to under techniques.
a. EPT should keep in installation condition and examine work problem regularly. Commence pump once every single month or every three months (about 5 minutes). Check operating issue before starting pump to insure there is sufficient liquid.
b. Dismantled pump from piping and examine it according to EPT five.1 to five.four. Utilize protecting agent on inside of pump casing eEPTTly the gap of the impeller, implement on suction and discharge, then include the suction.
c. Operation right after storage
Inspect and maintain fully just before starting pump, eEPTTly shaft seal and bearing lubricant. Reinstall all basic safety protection gadgets according to requirement just before commencing.
Troubleshooting
Problem |
Triggers |
Solution |
starting up load also higher |
one. Starting up with no closing discharge valve |
one. Shut the valve |
EPTT overheating |
1.EPTT also limited |
1. Unfastened EPTT appropriately |
EPTT leakage extreme |
1. EPTT worn |
1. Substitute EPTT |
EPT seal leakage |
one. The nominal pressure of mechanical seal reduced than real perform strain |
one. Adjust the variety of mechanical seal |
EPTTs over heating |
one.EPTTroper cEPTTring |
one. Readjust |
Vibration and noisy |
one. EPT functioning point B is not design pointnot design and style point minimal or large will result in vibration and noisy |
1. Change system EPTT functioning position or pump design and style parameters |
drinking water attack |
Air in pump or piping |
Evacuate air and remove the leads to |
EPT starts pumping then stops |
one. Clogged in suction line or impeller |
one. Thoroughly clean impeller, clean imEPT of strainer and suction piping |